NYC DOB record · B00528589-I1

961 Washington Avenue

961 Washington Avenue, Brooklyn, NY 11225

Alteration filing in Crown Heights (South), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00528589-I1

961 Washington Avenue

Brooklyn, NY 11225

Alteration filing · status dated Mar 17, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
40
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00528589-I1 as a alteration filing at 961 Washington Avenue, Brooklyn, NY 11225. Its latest published status category is Recorded as completed, dated Mar 17, 2022. The filing records 40 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Mar 17, 2022
Proposed scale
40 proposed dwelling units
Applicant of recordSee the 162 filings that name Navi Structural Engineering, PLLC
FiledMay 27, 2021
Current recordRecorded as completed
Proposed scale40 units
Recorded cost$6,000

What the filing says

A public-record reading of the proposed work.

Plumbing work in the lobby

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 13 notices on file; the most recent was issued Dec 22, 2022.

  • Construction

    Issued Dec 22, 2022 — FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. OBSERVED OPEN CEILING APPROX 3FT X 3FT IN APT 3B.

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00528589-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00528589-I1
BIN
3029725
BBL
3011920014
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
40
Proposed dwelling units
40
plumbing