NYC DOB record · X01257342-S6

979 Intervale Avenue

979 Intervale Avenue, Bronx, NY 10459

New building filing in Longwood, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 18, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01257342-S6

979 Intervale Avenue

Bronx, NY 10459

New building · status dated Sep 15, 2026

Current record
Approved
Proposed scale
7 stories
Dwelling units
41
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01257342-S6 as a new building at 979 Intervale Avenue, Bronx, NY 10459. Its latest published status category is Approved, dated Sep 15, 2026. The filing records 7 proposed stories and 41 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 15, 2026
Proposed scale
7 proposed stories and 41 proposed dwelling units
Applicant of recordSee the 295 filings that name Vasilios Artemiou PE
FiledAug 27, 2025
Current recordApproved
Proposed scale7 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Plumbing specifications filed in conjunction with gc application x01257342-i1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a garage or fuel station on a 5,000 sq ft lot.

Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
R7-1
Lot area
5,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01257342-S6.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01257342-S6
BIN
2131151
BBL
2026990054
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
7
Existing dwelling units
Empty in the source
Proposed dwelling units
41