NYC DOB record · M01415310-I1

106 Fort Washington Avenue

106 Fort Washington Avenue, Manhattan, NY 10032

Alteration filing in Washington Heights (South), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01415310-I1

106 Fort Washington Avenue

Manhattan, NY 10032

Alteration filing · status dated Sep 9, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
70
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01415310-I1 as a alteration filing at 106 Fort Washington Avenue, Manhattan, NY 10032. Its latest published status category is Approved, dated Sep 9, 2026. The filing records 6 proposed stories and 70 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 9, 2026
Proposed scale
6 proposed stories and 70 proposed dwelling units
Complete building dossierView all 2 filings associated with BIN 1063370Applicant of recordSee the 58 filings that name Edg
FiledJun 30, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$1.9M

What the filing says

A public-record reading of the proposed work.

Interior alterations, including modification of interior non-loadbearing partitions, bathrooms, and kitchens. No change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1920, with 69 homes, on a 16,771 sq ft lot.

Built
1920
Last altered
1987
Floors
6
Residential units
69
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R8
Lot area
16,771 sq ft
Building area
71,166 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 27 notices on file; the most recent was issued Feb 6, 2026.

  • Construction

    Issued Feb 6, 2026 — FTM PROPERTY IN SAFE & CODE COMPLIANT MANNER. UNDOCUMENTED INTERIOR ALTERATION/DEMO WORK PERFORMED CONTRARY TO APPOVED DRAWINGS 30FT IN LENGTH OF FLOOR JOIST. REMEDY: COMPLY WITH CODE. RETAIN NYS PE & REG GC TO EVALUATE. SUBMIT SIGNED & SEALED CONSTRUCTION DOCUMENTS TO YONUH@BUILDINGS.NYC.GOV OR MNBROWNLIE@BUILDINGS.NYC.GOV

  • Construction

    Issued Feb 6, 2026 — OWNER TO HIRE A NYS LICENSED PROFESSIONAL ENGINEER TO PREPARE AN ENGINEERING REPORT ADDRESSING THE AFOREMENTIONED CONDITION. ENGINEERING REPORT SHALL INCLUDE PLANS, PHOTOGRAPHS, RECOMMENDATIONS AND APPROXIMATE TIMEFRAME OF WHEN THE REPAIRS SHOULD BE COMPLETED BY THE OWNER AND BE SUBMITTED TO THE DOB (OBMSWO@BUILDINGS .NYC .GOV)

  • Construction

    Issued Nov 10, 2025 — MASONRY WALLS&STEEL FRAME&WOOD JOIST FLOORS BLDG DAMAGED BY FIRE ON 11/8/25.ROOF FRAMING SEVERELY DAMAGED&ROOF OPEN AT D&E LINES FLOOR FRAMNG @D&E LINES 5TH&6TH FLRS WAS DMGD&LOCALLY COMPROMISED.UNDR DRCT& CONTINOUS SPRVSN OF PE IMMED:1.INSTLL TEMP ROOF,3.INSTLL TEMP SHORNG AS REQ'D.PE TO SBMT MEANS&METHDS TO FEU

  • 3 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01415310-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01415310-I1
BBL
1021370126
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
70
Proposed dwelling units
70
General construction