NYC DOB record · M00723903-S4

200 East 75 Street

200 East 75 Street, Manhattan, NY 10021

New building filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00723903-S4

200 East 75 Street

Manhattan, NY 10021

New building · status dated Oct 8, 2026

Current record
Recorded as completed
Proposed scale
18 stories
Dwelling units
35
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00723903-S4 as a new building at 200 East 75 Street, Manhattan, NY 10021. Its latest published status category is Recorded as completed, dated Oct 8, 2026. The filing records 18 proposed stories and 35 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Oct 8, 2026
Proposed scale
18 proposed stories and 35 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1091731Applicant of recordSee the 141 filings that name Gea Consulting Engineers
FiledMay 25, 2022
Current recordRecorded as completed
Proposed scale18 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Mechanical work in conjunction with New Building # M00723903.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 79 notices on file; the most recent was issued Jan 13, 1997.

  • Local law 10/81 -

    Issued Jan 13, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00723903-S4.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00723903-S4
BBL
1014290045
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
18
Existing dwelling units
Empty in the source
Proposed dwelling units
35