NYC DOB record · B00002426-I1

262 Dahill Road

262 Dahill Road, Brooklyn, NY 11218

Alteration filing in Borough Park, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00002426-I1

262 Dahill Road

Brooklyn, NY 11218

Alteration filing · status dated Dec 28, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00002426-I1 as a alteration filing at 262 Dahill Road, Brooklyn, NY 11218. Its latest published status category is Approved, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
The building, not the filingEvery filing at BIN 3125141, with the parcel and violation recordApplicant of recordSee the 417 filings that name Kmb Design Group, LLC
FiledJun 19, 2018
Current recordApproved
Proposed scaleNot specified
Recorded cost$32,800

What the filing says

A public-record reading of the proposed work.

Replacement of existing telecommunications antennas with installation/replacement of related RRH units on roof. Installation and removal of cabinets with installation of RRH units on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1930, with 15 homes, on a 2,835 sq ft lot.

Built
1930
Floors
4
Residential units
15
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R5
Lot area
2,835 sq ft
Building area
10,308 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Nov 8, 2019.

  • Low pressure boiler

    Issued Nov 8, 2019 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT

  • Low pressure boiler

    Issued Mar 1, 2013 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT

  • Low pressure boiler

    Issued Dec 13, 2011 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00002426-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00002426-I1
BBL
3053510044
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
antenna