NYC DOB record · B00506210-I1

9 Dekalb Avenue

9 Dekalb Avenue, Brooklyn, NY 11201

Alteration filing in Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished.

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 31, 2026 · Verify the source row

Open full map
9 Dekalb Avenue record graphic showing the DOB filing status and stated proposal scale
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00506210-I1 as a alteration filing at 9 Dekalb Avenue, Brooklyn, NY 11201. Its latest published status category is Recorded as completed, dated Sep 10, 2025. The filing records 547 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 10, 2025
Proposed scale
547 proposed dwelling units
Complete building dossierView all 10 filings associated with BIN 3000370
FiledApr 22, 2021
Current recordRecorded as completed
Proposed scale547 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Emergency generator

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 58 open notices on record for this building, out of 180 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 55 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 5, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00506210-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00506210-I1
BBL
3001490100
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
547
Proposed dwelling units
547